← RegWatch
HomeRules

Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2; Exemption

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption, on its own initiative, from the regulation that would have required Duke Energy Progress, LLC (Duke) to submit an amendment to the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Pl

AgencyNuclear Regulatory Commission
Document typeNotice
Published2026-03-24
SummaryThe U.S. Nuclear Regulatory Commission (NRC) has issued an exemption, on its own initiative, from the regulation that would have required Duke Energy Progress, LLC (Duke) to submit an amendment to the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit No. 2 (Robinson), each year following its submittal and at least 3 months before scheduled completion of the NRC review, that identifies any change to the current licensing basis of the facility that materially affects the content of the application during the NRC's review of that application. Due to this exemption, such amendments are no longer required for the Robin
Document number2026-05658
Official recordhttps://www.federalregister.gov/documents/2026/03/24/2026-05658/duke-energy-progress-llc-hb-robinson-steam-electric-plant-unit-no-2-exemption

🔍 Search all rules →