Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Exempt
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant, Units 1 and 2, respectively, to be referred to the Advisory Committee on Reactor Safeg
| Agency | Nuclear Regulatory Commission |
|---|---|
| Document type | Notice |
| Published | 2026-03-11 |
| Summary | The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant, Units 1 and 2, respectively, to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required. |
| Document number | 2026-04777 |
| Official record | https://www.federalregister.gov/documents/2026/03/11/2026-04777/pacific-gas-and-electric-company-diablo-canyon-nuclear-power-plant-units-1-and-2-exemption |