← RegWatch
HomeRules

Pipeline Safety: Timeframe To Make RMVs Operational

PHMSA proposes to amend the required timeframes for making rupture-mitigation valves and alternative equivalent technology operational on gas transmission, hazardous liquid, and carbon dioxide pipelines.

AgencyTransportation Department, Pipeline and Hazardous Materials Safety Administration
Document typeProposed Rule
Published2026-04-24
SummaryPHMSA proposes to amend the required timeframes for making rupture-mitigation valves and alternative equivalent technology operational on gas transmission, hazardous liquid, and carbon dioxide pipelines.
Document number2026-08076
Official recordhttps://www.federalregister.gov/documents/2026/04/24/2026-08076/pipeline-safety-timeframe-to-make-rmvs-operational

🔍 Search all rules →